RailNET: Updating the Main Program: Difference between revisions
Appearance
No edit summary |
|||
| Line 1: | Line 1: | ||
This content | '''NOTE: '''This content was originally published Comet Electronics Document 480026: Updating Software. | ||
= Purpose = | = Purpose = | ||
<p> | <p>This procedure provides details for authorized personnel on updating the software on the RailNet APU-102. Regular updates are required to optimize functionality and resolve known issues.</p><p>Comet Electronics provides a software update package containing all required files.</p><p>`The user is responsible for:</p> | ||
*Backing up the current APU configuration to prevent data loss. | |||
*Executing the update using the provided files. | |||
*Verifying that the update was successful by checking system parameters and driver versions. | |||
<p>If you experience any issues during the update process, contact Comet Electronics[CS1] customer support for assistance.</p> | |||
<p>'''Requirements:'''</p> | <p>'''Requirements:'''</p> | ||
<p>· Upgrade file found here: [[RailNET Software]]</p> | <p>· Upgrade file found here: [[RailNET Software]]</p> | ||
| Line 24: | Line 26: | ||
{| class="wikitable" style="border-collapse: collapse; width: 76.8817%; height: 46px; border-color: rgb(0, 0, 0); border-style: solid;" border="2" | {| class="wikitable" style="border-collapse: collapse; width: 76.8817%; height: 46px; border-color: rgb(0, 0, 0); border-style: solid;" border="2" | ||
|- style="height: 46px;" | |- style="height: 46px;" | ||
! style="width: 40%; height: 46px; background-color: rgb(53, 152, 219);" | NOTE: | ! style="width: 40%; height: 46px; background-color: rgb(53, 152, 219);" | NOTE: | ||
! style="width: 60%; height: 46px;" | IF THE PROMPT GIVES YOU A TIME AND DATE OLDER THAN WHAT THE APU IS SHOWING AS TODAYS DATE, THEN START THE PROCESS OVER AGAIN | ! style="width: 60%; height: 46px;" | IF THE PROMPT GIVES YOU A TIME AND DATE OLDER THAN WHAT THE APU IS SHOWING AS TODAYS DATE, THEN START THE PROCESS OVER AGAIN | ||
Revision as of 15:44, 19 November 2025
NOTE: This content was originally published Comet Electronics Document 480026: Updating Software.
Purpose
This procedure provides details for authorized personnel on updating the software on the RailNet APU-102. Regular updates are required to optimize functionality and resolve known issues.
Comet Electronics provides a software update package containing all required files.
`The user is responsible for:
- Backing up the current APU configuration to prevent data loss.
- Executing the update using the provided files.
- Verifying that the update was successful by checking system parameters and driver versions.
If you experience any issues during the update process, contact Comet Electronics[CS1] customer support for assistance.
Requirements:
· Upgrade file found here: RailNET Software
Upgrade Procedure
| ATTENTION | DO NOT ATTEMPT TO UPDATE VIA SERIAL PORT! |
|---|
- Connect and login to the APU.
- Enter – ibackup
- We do this incase anything goes wrong.
- irestore will bring back the original parameters and software version.
- Do a Reboot
- Enter – Type \mirror.txt
- This will show you the backup that you just done.
- You will see an updated date and time with this prompt.
| NOTE: | IF THE PROMPT GIVES YOU A TIME AND DATE OLDER THAN WHAT THE APU IS SHOWING AS TODAYS DATE, THEN START THE PROCESS OVER AGAIN |
|---|
- Run a parameter dump (optional).
- Zrec the files. (F.BAT, V52_1_0.exe, ZIP.PSP).
- File is V5.2.1.0RC3 (this file name is subject to change as newer versions are made)
- Do a full reboot. There is no need to shell anything as this is a self-executing update.
- Your system should be updated. Don’t forget to look at your parameters as they will have to be updated.
- To make sure that the driver was updated, type, shell dir c:\windows\rtss\009\wdidvr.rts
- The output is shown below. The date provided should be 04/26/2024.
