Jump to content

Resistance ARC Welding in Proximity to AEI Equipment: Revision history

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

4 June 2026

  • curprev 18:1218:12, 4 June 2026 DGast talk contribs 988 bytes +139 No edit summary Tag: Visual edit
  • curprev 18:0718:07, 4 June 2026 DGast talk contribs 849 bytes +849 Created page with "Resistance ARC welding on or near the rail presents electrical and thermal hazards to AEI equipment and associated wiring. Comet Electronics' position on welding operations in the vicinity of AEI installations is as follows: Where AEI equipment is integrated with a track circuit, the track circuit must be disconnected and electrically isolated prior to any welding activity on the rail. Work should not commence until isolation is confirmed. All AEI equipment and associa..."